Lessons from the implementation of the reliability payment mechanism in Colombia as an incentive for electricity generation

No. 87 (2021-02-01)
  • José Camilo Juvinao Navarro

Abstract

The long-lasting consistency of a regulatory framework is essential for the proper functioning of incentives, particularly in industries such as electricity generation, with high sunk costs where different schemes have been developed to guarantee a long-term supply. In this respect, the instability of the regulatory framework can both impede the proper functioning of such incentives and, on occasion, violate the legitimate expectations of the agents involved. The purpose of this paper is to study the stability of the regulatory framework in terms of the long-term incentive mechanism for power generation applied in Colombia, known as “Cargo por Confiabilidad.” The findings of this paper suggest the independence of the regulatory agency must be strengthened and that the instability of the regulatory framework has generated redistributions of income among agents. This study observes that among these agents, the best-organized pressure groups benefit the most from such a redistribution of incomes.

Keywords: Energy policy, energy supply, energy crisis, capacity market, regulatory stability, Colombia

References

Batlle, C., & Pérez-Arriaga, I. (2008). Design criteria for implementing a capacity mechanism in deregulated electricity markets. Utilities Policy.

Botero, J., García, J., & Velásquez, H. (2016). Efectos del cargo por confiabilidad sobre el precio spot de la energía eléctrica en Colombia. Cuadernos de Economía, 35(68), 491-519.

Cramton, P., & Stoft, S. (2005). A capacity market that makes sense. Electricity Journal, 18, 43-54.

CREG (27 de octubre de 2015). Documento CREG 120 del 27 de octubre. Medidas para afrontar los eventos que podrían poner en riesgo la confiabilidad del sistema eléctrico. http://apolo.creg.gov.co/Publicac.nsf/1c09d18d2d5ffb5b05256eee00709c02/76a145fdb83f6f7e05257eec0077bdc2?OpenDocument

CREG (Comisión de Regulación de Energía y Gas). (2019). http://www.creg.gov.co/cxc/secciones/que_es/que_es.htm

Crowe, C., & Meade, E. (2007). The evolution of Central Bank governance around the world. Journal of Economics Perspectives, 21(4), 69-90.

Decker, C. (2015). Modern economic regulation. An introduction to theory and practice. Cambridge University Press.

DNP (Departamento Nacional de Planeación). (2017). Energy demand situation in Colombia. https://www.dnp.gov.co/Crecimiento-Verde/Documents/ejes-tematicos/Energia/MCV%20-%20Energy%20Demand%20Situation%20VF.pdf

Edwards, G., & Waverman, L. (2006). The effects of public ownership and regulatory independence on regulatory outcomes. Journal of Regulatory Economics, 29, 23-67.

Ernst & Young y Enersinc. (2016). Análisis comparativo de los aspectos teóricos y prácticos de los mercados mayoristas de electricidad en los países definidos por el DNP, con el fin de generar propuestas de política pública tendientes a la mejora del MEM de Colombia. Informe consolidado.

Fabra, N., & Creti, A. (2007). Supply security and short-run capacity markets for electricity. Energy Economics, 29(2), 259-276.

Flórez, M. E., Gómez-Duque, B., & García-Rendón, J. (2016). Análisis comparativo de diferentes esquemas de suficiencia en generación eléctrica: algunas reflexiones para el mercado eléctrico en Colombia (Documentos de Trabajo CIEF 014997). Universidad EAFIT.

Frontier Economics. (18 de mayo de 2019). Revisión institucional del mercado de energía mayorista de Colombia. Un informe para el Banco Interamericano de Desarrollo. https://www.frontier-economics.com/media/1120/20180118_revision-institucional-del-mercado-de-energia-mayorista-de-colombia_frontier.pdf

Gómez-Ibáñez, J. A. (2003). Regulating infraestructure. Monopoly, contracts, and discretion. Harvard University Press.

Hogan, M. (2017). Follow the missing money: Ensuring reliability at least cost to consumers in the transition to a low carbon power system. The Electricity Journal, 30, 55-61.

Joskow, P. (2006). Competitive electricity markets and investment in new generating capacity (Working Paper 06-14). AEI-Brookings Joint Center.

Linares, P., Rodillas, P., Gómez, T., Rivier, M., Frías, P., Chaves, J. P., Sánchez, Á., Gerres, T., Cossent, R., Olmos, L., Ramos, A.Rouco, L., & Martín, F. (2018). El sector eléctrico español del futuro: retos y políticas. Universidad Pontificia Comillas, Instituto de Investigación Tecnológica.

McRae, S., & Wolak, F. (2016). Diagnosing the causes of the recent El Niño event and recommendations for reform. Program on Energy and Sustainable Development, Stanford University.

NOAA. (2019). Multivariate ENSO Index Version 2 (MEI.v2). https://www.esrl.noaa.gov/psd/enso/mei/

Parra, A. (2015). Un análisis del mecanismo de subastas de cargo por confiabilidad en el mercado eléctrico colombiano. Econógrafos-Escuela de Economía, 87.

Restrepo-Estrada, M., Arango-Aramburo, S., & Vélez-Álvarez, L. (2012). La confiabilidad en los sistemas eléctricos competitivos y el modelo colombiano de cargo por confiabilidad. Cuadernos de Economía, 31(56), 199-222.

Riveros, C., Romero, G., Álvarez, A., Díaz, C., Calderón, S., & Melo, S. (29 de noviembre de 2017). Efectos económicos de futuras sequías en Colombia: estimación a partir del fenómeno El Niño 2015. https://colaboracion.dnp.gov.co/CDT/Estudios%20Econmicos/466.pdf

Spulber, D. (1989). Regulation and markets. MIT.

Villareal, J., & Córdoba, M. (2008). Incentivos y estructura del nuevo cargo por confiabilidad en el sector eléctrico en Colombia. Revista Ingeniería e Investigación, 28(3), 105-115.

Wolak, F. (2005). Report on “Proposal for determining and assigning the reliability charge for the wholesale energy market” and “Electronic System of Standardized Long-Term Contracts (SEC)”. Stanford University.

XM. (2019). https://www.xm.com.co/Paginas/Mercado-de-energia/cargo-por-confiabilidad.aspxAnexos

License